LOGOS documentation
Contents:
- Introduction
- Overview of Capital Budgeting Modeling Components
- Deterministic Capital Budgeting
- Prioritizing Project Selection to Hedge Against Uncertainty
- Distributionally Robust Optimization
- Defining a Distributional Uncertainty Set via the Wasserstein Distance
- Towards a Computationally Tractable Reformulation
- LOGOS Settings for DRO Problems
- DRO for Single Knapsack Problem
- DRO for Multi-Dimensional Knapsack Problem
- DRO for Multiple Knapsack Problem
- DRO for Multiple-Choice Knapsack Problem
- Risk-Based Stochastic Capital Budgeting using Conditional Value-at-Risk
- Resource-Constrained Project Scheduling Problem (RCPSP)
- Plugin for the RAVEN Code
- SSC Cashflow and NPV Models
- Knapsack Models
- Critical Path Model (CPM)
C. Rabiti, A. Alfonsi, J. Cogliati, D. Mandelli, R. Kinoshita, S. Sen, C. Wang, and J. Chen. RAVEN User Manual. Technical Report INL/EXT-15-34123, Idaho National Laboratory, March 2017.
A. Alfonsi, C. Rabiti, D. Mandelli, J. Cogliati, C. Wang, P. W. Talbot, D. P. Maljovec, and C. Smith. RAVEN Theory Manual and User Guide. Technical Report, Idaho National Laboratory, 2017.
A. Koç, D. P. Morton, E. Popova, S. M. Hess, E. Kee, and D. Richards. Prioritizing project selection. The Engineering Economist, 54(4):267–297, 2009.
P. Artzner, F. Delbaen, J. M. Eber, and D. Heath. Thinking coherently. Risk, 10:68–71, 1997.
P. Artzner, F. Delbaen, J. M. Eber, and D. Heath. Coherent measures of risk. Mathematical Finance, 9(3):203–228, 1999.
R. T. Rockafellar and S. P. Uryasev. Optimization of conditional value at risk. Journal of Risk, 2:21–42, 2000.
G. C. Pflug. Some remarks on the value at risk and the conditional value at risk. In Probabilistic Constrained Optimization: Methodology and Applications, pages 278–287. 2000.